SolisReach
← Journal
Working with us5 min read

How we structure a 3-person team across two continents for one client

Written by the SolisReach team

For larger engagements, we sometimes deliberately split a project team across two continents rather than keeping everyone in New Delhi, not because it's more convenient, it genuinely isn't, but because a well-designed split can extend a client's effective working day rather than just shifting it entirely to ours. Here's how we actually structure that when it makes sense.

Why we do this at all, given the added coordination cost

A single time-zone team means work happens during our hours and waits during the client's. A split team, part in New Delhi, part in a time zone closer to the client's own, means someone is actively working during more of the client's actual business day, catching questions and blockers in something closer to real time rather than a next-morning turnaround.

The roles that split well, and the ones that don't

A project lead or account manager based closer to the client's time zone, handling communication and quick decisions, pairs well with a core build team based in New Delhi doing the bulk of the deep work during their own focused hours. Splitting the actual hands-on build work itself across time zones, by contrast, tends to create more handoff friction than it saves, since deep technical work benefits from continuous focus more than from time zone coverage.

The handoff document that makes this actually work

At the end of each working session, whichever half of the team is finishing their day writes a short, specific handoff: what was completed, what's blocked and why, and exactly what the other half needs to know before picking it up. This isn't a status update for the client, it's an internal tool, and it's the single biggest factor in whether a split team actually functions as one team or as two disconnected halves.

What clients actually notice about this setup

Clients on this kind of team structure consistently report that questions get answered faster and blockers get resolved same-day more often than on single-time-zone engagements, which is exactly the intended effect. What they don't see, and don't need to, is the internal coordination overhead this requires from us, which is real and is exactly why we only use this structure on engagements large enough to justify it.

When we don't recommend this structure

Smaller engagements don't have enough ongoing work to justify the coordination overhead, and a single well-run New Delhi team with a strong handoff process, as we've written about separately, covers the time zone gap adequately for most projects. This structure is a deliberate tool for a specific kind of larger, longer engagement, not a default we reach for on every project.

Smaller engagements don't have enough ongoing work to justify the coordination overhead, and a single well-run New Delhi team with a strong handoff process, as we've written about separately, covers the time zone gap adequately for most projects.

The specific meeting cadence that keeps both halves aligned

Beyond the daily written handoff, we schedule one recurring live overlap call each week where both halves of the team are present simultaneously, even if that means someone joining outside their normal working hours occasionally. Written handoffs cover the day-to-day, but a live call surfaces the kind of nuanced, harder-to-write-down context, a design decision that felt uncertain, a client comment that needs some reading between the lines, that tends to get lost or flattened in a purely asynchronous note.

We keep this call short, usually thirty minutes, and protect it fiercely against being skipped when things feel busy, since it's precisely during the busiest weeks that misalignment between the two halves of the team is most likely to happen and most costly once it does.

How we picked which time zone to pair New Delhi with

The choice isn't arbitrary: we look for a time zone with a meaningful overlap window with both New Delhi and the client's own hours, typically four to six hours of genuine three-way overlap, since a split that only connects two of the three parties at any given time recreates the same handoff delay problem the structure was meant to solve in the first place. For a client based on the US West Coast, this has sometimes meant a team member based in Europe rather than the more obvious choice of the Americas, purely because the overlap math worked out better across all three time zones simultaneously.

The single point of failure risk, and how we mitigate it

A three-person team split across two continents concentrates critical project knowledge in very few people, and if the client-facing lead is unavailable for any reason, illness, travel, a personal emergency, the coordination this structure depends on can break down quickly unless someone else genuinely understands enough of the project to step in. We require at least one other team member, regardless of location, to be kept current enough through the daily handoff documents to cover for the lead on short notice, rather than treating that knowledge as something that lives in one person's head alone.

This redundancy costs a small amount of ongoing overhead, since it means the handoff documents have to be genuinely thorough rather than just a quick note between two people who already share full context. It's overhead we've come to see as non-negotiable for any engagement built around this structure, given how much a client's confidence in the whole arrangement depends on continuity holding even when one specific person is unexpectedly out, and it's a cost we build into the pricing of any engagement structured this way rather than treating it as invisible overhead absorbed quietly on our side, since pretending it's free would only mean cutting a corner the client would eventually notice, usually at the worst possible moment for both sides, whether that's a missed deadline or a key person being unreachable when the client needed an answer fastest.

Clients who've only ever worked with a single-location team sometimes assume a cross-continent structure adds friction by default. In our experience it's closer to the opposite once the roles and redundancy are set up deliberately: the client effectively gets coverage across a working day nearly twice as long as a single-time-zone team could offer, and the discipline the structure forces around documentation and handoffs tends to produce clearer records than a co-located team, which can get away with a lot of undocumented tribal knowledge simply because everyone's in the same room to ask.

Start a project

Want this applied to your site?

We run a Core Web Vitals and SEO audit before quoting any performance marketing engagement, and we're happy to share what we'd find on yours.